Skip to content Skip to footer

Zones industrielles non aménagées

Mdhilla Industrial Zone
  • Total surface : 50 ha
  • Vocation : Industrial
  • Proprietary: PCG
  • Networking : under study
  • Study progress : Subdivision approval (06ha / 50 ha)
  • Number of lots : 23
  • PCG constructions : 01/1200 m² (outside the area)
Advantages Disadvantages
  • Multi-sector
  • 22 km / airport
  • 18 Km / Ksar train station
  • Attached to R. Ségai
  • 20 km / Downtown
  • Expandable area
  • Unfinished
  • Absence of portable water
  • No Gaz
  • No Sanitation
  • No electricity
  • Partial study 06ha / 50 ha
Redeyef Industrial Zone
  • Total surface : 27 ha
  • Vocation : Industrial
  • Proprietary: State domain
  • Networking : (électricité – Télécom)
  • Study progress : studies completed (07 ha / 27 ha)
  • Number of lots : 19
  • Affected lots : (02 Lots / 11 028 m²)
  • Number of companies : (01 in activity / 01 in progress)
  • PCG constructions : 02 Areas / 6,600 m² covered

                                     02 Spaces / 10,700 (outside the area)

                                     01 Cyber Parc (R+3 1000 m²) / outside the area

Advantages Disadvantages
  • Multi-sector
  • 72 km / airport
  • 70 Km / Ksar train station
  • Attached to the Regional R. 201
  • 65 km / Downtown
  • Expandable area
  • Unfinished
  • Absence of portable water
  • No Gaz
  • No Sanitation
  • Partial study 07 ha / 27 ha
  • State domain property
Chabiba Gafsa North Industrial Zone
  • Total surface : 17 ha
  • Vocation : Agricultural
  • Proprietary: State domain
  • Networking : (electricity - Telecom - drinking water)
  • Study progress : programmed for study
Advantages Disadvantages
  • 20 km / airport
  • 24 Km / Ksar train station
  • Attached to RN3
  • 23 km / Downtown
  • Expandable area
  • Agricultural region
  • Connected with the planned motorway
  • Unfinished
  • Absence of portable water
  • No Gaz
  • No Sanitation
  • No electricity
  • Partial study 06ha / 50 ha
Technopole
  • Total surface : 88 ha
  • Vocation : (62 ha) Agricultural / (26 ha) industrial
  • Proprietary: PCG
  • Networking : under study
  • Study progress : PAD approval pending
Advantages Disadvantages
  • Specialized in mechatronics-renewable energy fine chemicals
  • 02 km / airport
  • 05 Km / Ksar train station
  • Attached to RN14 and near RN3
  • 24 km / Downtown
  • Near the planned highway
  • Near Hotel Gafsa palace
  • Connected with the planned motorway